兽皇videos极品另类,亚洲av永久无码精品天堂动漫,最近免费中文字幕大全高清10,性无码专区无码

News

Current Position: Home > News
What should I pay attention to before and after using the gas mold temperature machine?
announcer:

In industrial production temperature control equipment, the use of gas mold temperature machine is very common. It can be seen in the production of zinc alloy die casting, magnesium aluminum alloy die casting, rubber and plastic extrusion, and injection molding products. In addition to the advantages of relatively simple and convenient operation methods, most of the units are automatically operated. After only using the operation and setting the temperature, the operation method personnel do not need to re-unit, if the unit has a malfunction, there will be immediate Alarm reminder. But in addition to the old users who have already applied machinery and equipment, many customers are also exposed to this equipment at the beginning. They are very concerned about how to correctly apply the gas mold temperature machine, and what is the correct operation process?

 

1. Inspection before operation of gas mold temperature controller

Check whether the surrounding area is clean and free of debris, check whether the switching power supply, electric heater, control board, barometer, pump, etc. are all normal; whether the valve of the water cooling pipe has been opened, and whether the water cooling supply is normal;

Check whether the oil level of the expansion tank is correct, whether the liquid level sensor, etc. are normal;

Connect to the switching power supply of the control cabinet, check whether the voltage is normal, and check whether the indicator lights and display instruments are normal.

2. Operation method of machine equipment

Operate the heat transfer oil circulation pump, after starting the pump, all normal circulation will stabilize the pressure within 0.5 hours;

Press the heating operation button and observe whether the heating is normal;

Be sure to pay attention to the condition of the barometer during the initial operation.

3. Operation method of machine equipment shutdown

All normal shutdown: gradually reduce the temperature and stop heating. When the temperature of the heat transfer oil drops below 70°C, stop the operation of the heat transfer oil circulation pump; turn off the main switching power supply and make handover statistics.

Emergency shutdown: If the emergency shutdown occurs due to an emergency, the heating tube should be quickly turned off to facilitate the natural cooling of the thermal oil and avoid overheating.

4. FAQ

During the inspection, pay attention to check whether there is leakage around the gas mold temperature machine. The surrounding should be equipped with sufficient oil and electrical fire fighting equipment, and it is forbidden to use water as a fire extinguishing agent.

亚洲成A人片在线观看久| 免费一本色道久久一区| 啦啦啦免费视频播放| 人妻被按摩到潮喷中文字幕| 人妻精油按摩bd高清中文字幕| 久久无码精品一一区二区三区| 国产精品香蕉自产拍在线观看| 午夜成人理论福利片| 国产欧美日韩专区发布| 欧美老人巨大XXXX做受| 色偷偷人人澡久久超碰97| 亚洲熟妇AV一区二区三区漫画| 午夜大胆裸体A级人体片| 国产成人一区二区三区在线| 中国少妇初尝黑人巨高清| 久久综合五月丁香六月丁香| 婷婷综合久久中文字幕蜜桃三电影| 一二三四在线视频观看社区| 网禁拗女稀缺资源在线观看| 精品日产乱码卡一卡2卡三| 国产成人一区二区三区在线观看| 亚洲欧美一区二区三区在线| 翁公和媛媛在厨房里猛烈进出| 久久WWW免费人成一看片| 两个人看的WWW高清免费| 亚洲精品午夜久久久伊人| 国产日韩av免费无码一区二区三区| 亚洲熟女WWW一区二区三区| 中美日韩毛片免费播放| 成年女性特黄午夜视频免费看| 日本不卡一区二区三区在线| 少妇高清精品毛片在线视频| 扒开双腿猛进入喷水高潮视频| 久久国产精品成人无码网站| 国产成人亚洲综合无码18禁H| 色婷婷综合久久久久中文一区二区| 成人午夜污污在线观看网站| 人妻无码中文专区久久AV| 日韩精品无码观看视频免费| 无码av免费毛片一区二区| 亚洲一区二区三区 无码|