兽皇videos极品另类,亚洲av永久无码精品天堂动漫,最近免费中文字幕大全高清10,性无码专区无码

News

Current Position: Home > News
What should I pay attention to before and after using the gas mold temperature machine?
announcer:

In industrial production temperature control equipment, the use of gas mold temperature machine is very common. It can be seen in the production of zinc alloy die casting, magnesium aluminum alloy die casting, rubber and plastic extrusion, and injection molding products. In addition to the advantages of relatively simple and convenient operation methods, most of the units are automatically operated. After only using the operation and setting the temperature, the operation method personnel do not need to re-unit, if the unit has a malfunction, there will be immediate Alarm reminder. But in addition to the old users who have already applied machinery and equipment, many customers are also exposed to this equipment at the beginning. They are very concerned about how to correctly apply the gas mold temperature machine, and what is the correct operation process?

 

1. Inspection before operation of gas mold temperature controller

Check whether the surrounding area is clean and free of debris, check whether the switching power supply, electric heater, control board, barometer, pump, etc. are all normal; whether the valve of the water cooling pipe has been opened, and whether the water cooling supply is normal;

Check whether the oil level of the expansion tank is correct, whether the liquid level sensor, etc. are normal;

Connect to the switching power supply of the control cabinet, check whether the voltage is normal, and check whether the indicator lights and display instruments are normal.

2. Operation method of machine equipment

Operate the heat transfer oil circulation pump, after starting the pump, all normal circulation will stabilize the pressure within 0.5 hours;

Press the heating operation button and observe whether the heating is normal;

Be sure to pay attention to the condition of the barometer during the initial operation.

3. Operation method of machine equipment shutdown

All normal shutdown: gradually reduce the temperature and stop heating. When the temperature of the heat transfer oil drops below 70°C, stop the operation of the heat transfer oil circulation pump; turn off the main switching power supply and make handover statistics.

Emergency shutdown: If the emergency shutdown occurs due to an emergency, the heating tube should be quickly turned off to facilitate the natural cooling of the thermal oil and avoid overheating.

4. FAQ

During the inspection, pay attention to check whether there is leakage around the gas mold temperature machine. The surrounding should be equipped with sufficient oil and electrical fire fighting equipment, and it is forbidden to use water as a fire extinguishing agent.

亚洲高清专区日韩精品| 国产精品电影久久久久电影网| 真实国产普通话对白乱子子伦视频| 好吊色欧美一区二区三区视频| 国产丰满乱子伦无码专区| 四虎AV永久在线精品免费观看| 少妇老师寂寞难耐高潮| 免费人成年激情视频在线观看| 女人与公拘交酡全过女免费| 久久精品无码一区二区日韩AV| 自愉自愉产区二十四区| 亚洲AV无码男人的天堂在线| 国产成人亚洲精品| 国产成人一区二区青青草原| 亚洲AV无码专区国产乱码DVD| 午夜不卡欧美AAAAAA在线观看| 天天射天天日本一道| 国产精品无码无卡在线观看| 国产精品亚洲综合久久系列| 国产免费看插插插视频| 中文字幕人妻偷伦在线视频| 人人妻人人玩人人澡人人爽| 男女后式激烈动态图片| 日日摸夜夜添夜夜添无码视频夫区| 国产乱子伦视频在线播放| 亚洲七久久之综合七久久| 777国产偷窥盗摄精品品在线| √最新版天堂资源在线| 国产激情一区二区三区小说| 亚洲天堂2017无码中文| 伊伊人成亚洲综合人网7777| 午夜理论片YY6080影院| 免费欧洲毛片A级视频| 无码免费一区二区三区免费播放| 特黄特色高清不卡免费视频| 国产精品白丝喷水在线观看| 国产三级精品三级在线观看| 日本卡一卡2卡三卡4乱卡乱码| 国产精品久久久久精品小草| 99国精品午夜福利视频不卡| 人人妻人人澡人人爽人人精品97|