兽皇videos极品另类,亚洲av永久无码精品天堂动漫,最近免费中文字幕大全高清10,性无码专区无码

News

Current Position: Home > News
What should I pay attention to before and after using the gas mold temperature machine?
announcer:

In industrial production temperature control equipment, the use of gas mold temperature machine is very common. It can be seen in the production of zinc alloy die casting, magnesium aluminum alloy die casting, rubber and plastic extrusion, and injection molding products. In addition to the advantages of relatively simple and convenient operation methods, most of the units are automatically operated. After only using the operation and setting the temperature, the operation method personnel do not need to re-unit, if the unit has a malfunction, there will be immediate Alarm reminder. But in addition to the old users who have already applied machinery and equipment, many customers are also exposed to this equipment at the beginning. They are very concerned about how to correctly apply the gas mold temperature machine, and what is the correct operation process?

 

1. Inspection before operation of gas mold temperature controller

Check whether the surrounding area is clean and free of debris, check whether the switching power supply, electric heater, control board, barometer, pump, etc. are all normal; whether the valve of the water cooling pipe has been opened, and whether the water cooling supply is normal;

Check whether the oil level of the expansion tank is correct, whether the liquid level sensor, etc. are normal;

Connect to the switching power supply of the control cabinet, check whether the voltage is normal, and check whether the indicator lights and display instruments are normal.

2. Operation method of machine equipment

Operate the heat transfer oil circulation pump, after starting the pump, all normal circulation will stabilize the pressure within 0.5 hours;

Press the heating operation button and observe whether the heating is normal;

Be sure to pay attention to the condition of the barometer during the initial operation.

3. Operation method of machine equipment shutdown

All normal shutdown: gradually reduce the temperature and stop heating. When the temperature of the heat transfer oil drops below 70°C, stop the operation of the heat transfer oil circulation pump; turn off the main switching power supply and make handover statistics.

Emergency shutdown: If the emergency shutdown occurs due to an emergency, the heating tube should be quickly turned off to facilitate the natural cooling of the thermal oil and avoid overheating.

4. FAQ

During the inspection, pay attention to check whether there is leakage around the gas mold temperature machine. The surrounding should be equipped with sufficient oil and electrical fire fighting equipment, and it is forbidden to use water as a fire extinguishing agent.

宝贝扒开下面自慰给我看| 国产精品自在线拍国产| 日本免费一本天堂在线| 日韩人妻中文无码一区二区| 伊人WWW22综合色| 国产精品高潮呻吟久久av| 国产白丝无码免费视频| 日韩无矿砖2021中文字幕| AV明星换脸无码精品区| 亚洲精品无码专区在线播放| 亚洲婷婷综合色高清在线| 亚洲欧洲精品专线| 国产成人18黄网站| 日本免费一区二区三区激情视频| 国产精品一卡二卡三卡四卡| 欧美日产国产精品| 亚洲av一本岛在线播放| 永久免费AV无码网站在线观看| 亚洲国产成人影院在线播放| 亚洲中文无码永久免费| 成全动漫视频观看免费下载| 亚洲av极品视觉盛宴| 国产成人无码一区二区在线播放| 黑人太粗太深了太硬受不了了| 国产成人无码18禁午夜福利免费| 无码人妻精品一区二区三| WWW插插插无码视频网站| 欧美日韩在线亚洲二区综二| 亚洲VA在线VA天堂VA欧美VA| 国产福利姬喷水福利在线观看| 亚洲人成网站免费播放| 亚洲AV伊人久久青青草原| 影视先锋av资源噜噜| 高清无码一区二区在线观看吞精| 人人妻人人超人人| A亚洲VA欧美VA国产综合| 亚洲 另类 日韩 制服 无码| 亚洲av无码久久| 亚洲和欧洲一码二码区别7777| 一本一道色欲综合网中文字幕| 777精品久无码人妻蜜桃|