兽皇videos极品另类,亚洲av永久无码精品天堂动漫,最近免费中文字幕大全高清10,性无码专区无码

News

Current Position: Home > News
What should I pay attention to before and after using the mold temperature machine?
announcer:
In industrial production temperature control equipment, the use of mold temperature machine is very common. It can be seen in the production of zinc alloy die casting, magnesium alloy die casting, rubber and plastic extrusion, and injection molding products. In addition to the advantages of relatively simple and convenient operation methods, most of the units are automatically operated. After only using the operation and setting the temperature, the operation method personnel do not need to re-unit, if the unit has a malfunction, there will be immediate Alarm reminder. But in addition to the old users who have already used machinery and equipment, many customers are also exposed to this equipment at the beginning. They are very concerned about how to correctly apply the mold temperature machine, and what is the correct operation process?
1. Inspection before operation of mold temperature machine
Check whether the surrounding area is clean and free of debris, check whether the switching power supply, electric heater, control board, barometer, pump, etc. are all normal; whether the valve of the water cooling pipe has been opened, and whether the water cooling supply is normal;
Check whether the oil level of the expansion tank is correct, whether the liquid level sensor, etc. are normal;
Connect to the switching power supply of the control cabinet, check whether the voltage is normal, and check whether the indicator lights and display instruments are normal.
2. Operation method of machine equipment
Operate the heat transfer oil circulation pump, after starting the pump, all normal circulation will stabilize the pressure within 0.5 hours;
Press the heating operation button and observe whether the heating is normal;
Be sure to pay attention to the condition of the barometer during the initial operation.
3. Operation method of machine equipment shutdown
All normal shutdown: gradually reduce the temperature and stop heating. When the temperature of the heat transfer oil drops below 70°C, stop the operation of the heat transfer oil circulation pump; turn off the main switching power supply and make handover statistics.
Emergency shutdown: If the emergency shutdown occurs due to an emergency, the heating tube should be quickly turned off to facilitate the natural cooling of the thermal oil and avoid overheating.
4. FAQ
During the inspection, pay attention to check whether there is leakage around the mold temperature machine. The surrounding should be equipped with sufficient oil and electrical fire fighting equipment, and it is forbidden to use water as a fire extinguishing agent.
人妻少妇乱子伦无码视频专区| 艳妇荡女欲乱双飞两中年熟妇| 午夜神器18以下不能进免费| 高潮潮喷奶水飞溅视频无码| 国产剧情AV无码传媒| 久久综合给合久久狠狠狠97色| 在线 欧美 中文 亚洲 精品| 免费高清特级毛片A片| AV一本久道久久波多野结衣| 国产真实伦在线观看| 精品久久久久中文字幕一区| 97色伦综合在线欧美视频| 亚洲AV无码国产丝袜在线观看| 亚洲av无一区二区三区| 日本少妇又色又爽又高潮| 麻豆亚洲国产成人精品无码区| 色8久久人人97超碰香蕉987| 丰满少妇女人A毛片视频| 强开乖女嫩苞又嫩又紧免费视频| 中文字幕成熟丰满人妻| 亚洲精品国产V片在线观看| 两个人看的www高清视频中文| 国产亚洲3p无码一区二区| 亚洲午夜爱爱香蕉片| 久久国产欧美成人网站| AV狠狠色超碰丁香婷婷综合久久| 国产成人综合95精品视频| 久久无码字幕中文久久无码| 欧美多人片高潮野外做片黑人| 亚洲 欧美 偷自乱 图片| 精品久久久久久国产| 98精产国品一二三产区区| 人人妻人人藻人人爽欧美一区| 国色精品卡一卡2卡3卡4卡在线| 色婷婷综合久久久久中文一区二区| 亚洲乱码卡一卡二卡新区仙踪木木| 在线播放免费人成视频在线观看| 欧美性开放bbw| 国产白嫩护士被弄高潮| 亚洲欧美激情精品一区二区| 风流老熟女一区二区三区|